Date:    7-21-2010
Number of Hours:    2.00
Brief Description:    Tailcone Fairing
Finished drilling of tailcone fairing tabs and nutplates. Installed nutplates as per Steps 6-8, page 12-07 and Steps 1-4, page 12-08.