Date:    1-17-2015
Number of Hours:    9.00
Brief Description:    More HS prep
The period 1/17 through 1/29 included most of the countersinking and dimpling. Made two drill press jigs for countersinking the spars and spar caps, fabricated the two HS cradles for holding the HS assemblies. Ready for priming.