| Date: |
11-22-2014 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Vertical Stabilizer |
|
|
Since 11/23, prep VS parts; scoth-brite ribs and spar parts, flanges fluted and dimpled, skin clecoed to assembled VS sub-structure and match drilled and reamed rivet holes for fit. Plus, more shop arrangement, and floor and bench tool prep. |
||