| Date: |
2-16-2019 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
finished fabricating flying/landing cables |
|
|
I single crimped all the landing/flying wires to length. I then triple crimped the cable clamps. Then the excess cable was cut off and the ends whipped with 30# mason line followed by a coat of brush on crazy glue. |
||