Date:    2-16-2019
Number of Hours:    6.00
Brief Description:    finished fabricating flying/landing cables
I single crimped all the landing/flying wires to length. I then triple crimped the cable clamps. Then the excess cable was cut off and the ends whipped with 30# mason line followed by a coat of brush on crazy glue.