Date:    2-19-2018
Number of Hours:    5.00
Brief Description:    level and rigging basics
Levelled the airplane as close as possible. Found the spot on the fuselage for future levelling reference. Image 3 is the culprit it has to be shortened about 3/8" to make the bottom wing level.
The top wing has an incidence anle of 1 1/2" degrees along the whole wing. Perfect.