| Date: |
11-21-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
fairleads and bellcranks |
|
|
Today I fabricated the transition bellcranks for the elevators. Also. I fabricated the fairleads where the lower elevator cables exit the fuselage between the stringers. |
||