| Date: |
11-8-2017 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
elevator work |
|
|
Welded washers on hinges for strengthening and rounded the corners. Ran strings from elevator transition through fuse to get locations of fairleads if needed. Close-up of transition with strings attached(pun intended). |
||