Date:    9-12-2008
Number of Hours:    1.10
Brief Description:    Securing vertical stabilizer
Drill 3/16" holes in boom tail post and secure vertical stabilizer with HM-16 3/16" rivets with 6 on each side totaling 12.

Reinforce HB-17 and HB-18 brackets with an extra row of 1/8: rivets.

Dust off left wing unit and lay out on work table.