| Date: |
9-11-2008 |
|
| Number of Hours: |
0.80 |
|
| Brief Description: |
Vertical stabilizer mounting |
|
|
Reinforce fabric with 3 additional rivets at lower end of leading edge. Secure left HB-17 and HB-18 brackets to tail boom with HM-14L 1/8" long rivets. Secure upper parts of these brackets to bottom edge of vertical stabilizer with 1/8" rivets. |
||