| Date: |
10-19-2008 |
|
| Number of Hours: |
1.90 |
|
| Brief Description: |
Rear engine mount brace |
|
|
Position U-brackets, mark and drill1/8" holes and secure into place with 1/8" HM-14 rivets. Mount HF-122 curved cross brace and secure into place with AN3-14A bolts and locknuts. Position and drill rivet holes into fabricated steel U-bracket and secure with 1/8" rivets. Secure HF-121 to bracket with AN3-14A bolt, steel washer and locknut. Position and cut to shape and deburr boom brackets HB-17 L&R and secure to HF-121 and boom tube doubler plate with 1/8" long rivets HM-14L. |
||