| Date: |
11-30-2009 |
|
| Number of Hours: |
1.30 |
|
| Brief Description: |
Initial Test Fit |
|
|
Assemble prop blades (3) into hun castings. Dry fit prop and set rough initial pitch using .065 of feeler gauges. Torque prop blade mounting bolts to 175 in-lbs. Bolt assemble to prop flange on engine. All fits. Remove prop assembly and set aside for final installation. |
||