| Date: |
8-26-2009 |
|
| Number of Hours: |
0.20 |
|
| Brief Description: |
Flap and Aileron Cable Test Fit |
|
|
Do fine adjustment of left flap pushrod length and test fit with AN3-5 drilled bolt, washer and castle nut. Reswage control cables onto side cabin turnbuckles for better finish as shown by tech counselor. |
||