| Date: |
7-1-2008 |
|
| Number of Hours: |
1.30 |
|
| Brief Description: |
Aileron crank |
|
|
Notch out front bulkhead boom tube 5/16" to provide added cearance for aileron crank, and then file smooth. See video. Drill 3/16" hole through collar of HC-72 aileron crank and bearing tube. Apply epoxy putty and secure into pace with HH-19 (AN3-14A) bolt, washer and locknut. See Dwg. 16. |
||