| Date: |
6-9-2008 |
|
| Number of Hours: |
1.90 |
|
| Brief Description: |
Reinforcement gussets; nose wheel steering |
|
|
Spray prime floor panel and gussets HG-18 (4), HG-40 (2), HG-36 (2) and HG-28 (2). Rvet above gussets into place onto HF-39 (L & R), nose girders. See`Dwg. 6 Rivet HF-94 floor cross brace, with nose wheel bell crank mounted on it) into place with HG-18 gussets, all held in place with HM-14 1/8" rivets. See Dwg. 5A. Bolt LG-17 (L & R) ontoHC-1 forward rudder pedals (L & R) using HH-13 bolts (AN3-5), nylon washers, castle nuts and cotter pins. |
||