Date:    10-10-2007
Number of Hours:    3.20
Brief Description:    control cable housings
Installed control cable housings HC-23 (4 lengths) as set forth in entry for 10/8/07.

Installed HF-7 and 7A and HF-91 and 9 and brackets HB-16 on forward bulkhead (see dwg. detail on Dwg 1) as per Inst. 3 on p.3 of rev. 2/11/06 instructions using HH-8, HH-2 and HH-19, HH-5 bolts and nuts