| Date: |
11-1-2007 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Gussets and stiffeners |
|
|
Drilled and riveted 4 HG-20 gussets to upper cabin reinforcement HF-104 and HF-11 trailing edge conneting tubes using a total of 32 1/8" rivets. Installed 2 overhead cabin stiffeners (HB-33) onto HF-90TP forward curved overhead and HF-91 front down tubes using 1/8" rivets. See Inst. 15, dwgs 2 and 4. |
||