| Date: |
2-17-2008 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Throttle and mixture brackets |
|
|
The engine has had the new sump fitted and been dyno run so everything can be connected for keeps . The standard Vans mixture linkage/bracket fit with some minor tweaking, not so the throttle bracket, I will have to make something up. |
||