| Date: |
9-23-2004 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Bending elevator skins |
|
|
(1) These trailing edge rivets have to be double flush. This is a shot of the worked side of the rivets.(2) This homemade folder is made from a heavy piece of ally channel, a length of chipboard and a piece of piano hinge fastened to the bench. |
||