| Date: |
4-25-2011 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Misc |
|
|
Assembled the springs for the Zeus screws on wing locker cover. Drilled holes and inserted gromets for landing lights and positionlight/strobe wiring. drilled holes for and mounted the strobe light control box. |
||