| Date: |
11-19-2012 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Nose strut and fork |
|
|
Using drill press at home; drilled nose wheel fork (2 parts) to nose wheel strut. measured and drilled 2 holes on each side to tie 2 fork parts together per plans. Drilled 3/4" hole on both sides of fork for axle. Drilled 2 holes through axle for cotter pins to lock castle nuts. |
||