| Date: |
10-3-2012 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
|
|
|
Finished pre-drilling baggage floor. Drilled baggage floor to final rivet size. cut 2 "L" angles for seat back support. Drilled seat back middle to final rivet size. Cut upper longeron front caps per plans and fit into position. |
||