| Date: |
2-18-2012 |
|
| Number of Hours: |
0.75 |
|
| Brief Description: |
Finished Right Elevator |
|
|
Finished up the right elevator today except for the fiberglass work that I will do later. I installed pop rivets and the rod end hinge bearings with their lock nuts. I haven't torqued the lock nuts yet because I still need to check for fit. |
||