Date:    2-15-2012
Number of Hours:    0.50
Brief Description:    Final Drilled Leading Edge of Right Elevator
Final drilled the rolled leading edge of the right elevator with a #30 reamer then deburred. I also primed the area of the bottom skin that will be overlapped by the top skin.