| Date: |
2-1-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Riveted Right Elevator |
|
|
I started off today by putting a dab of "The Right Stuff" gasket maker on the last rivet of each trailing edge stiffener to help absorb vibration in hopes of preventing cracks. After doing that I inserted the right elevator skeleton into the skin then clecoed and riveted everything together. |
||