| Date: |
1-21-2012 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Assembled Right and Left Elevators |
|
|
I clecoed the E-709 root rib right to E-702 right spar and clecoed E-705 root rib left to E-702 left spar and final drilled to #40. Then I clecoed the E-701 skins on to the understructures. I then clecoed and drilled the WD-605 right and left elevator horns on. This is where I will leave the left elevator and finish up the right elevator. |
||