| Date: |
10-28-2009 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Finish assembly, begin match-drilling skins |
|
|
Trimmed and clecoed trailing edge piece to right elevator and also clecoed and final-drilled the elevator horn. Match-drilled top and bottom skins to right elevator. |
||