Date:    10-10-2013
Number of Hours:    0.50
Brief Description:    Initial riveting of structure
Having gotten the control horn back from the powder-coater, assembled the bottom rib and, while I was at it, also the doubler plates and plate-nuts on the main spar.

Rivet count: (29 redo) Total: 15865 - Plus 549 done at Van's