Date:    7-13-2015
Number of Hours:    2.20
Brief Description:    Finish left baggage floor
I finished riveting the nutplates for the left baggage floor. Then I moved on to the rear baggage door seals and installed them. Riveting the F-1026 was a real challenge; I had to uncleco the #30 clecos so I could twist the part and wedge my small tungsten bar to get the topmost and bottommost AN426 rivets. The rest was pretty easy, though.

Rivet count: 77 (0 redo, 530 total redone) Total: 16256 - Plus 549 done at Van's