| Date: |
8-15-2011 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Riveted left substructure together |
|
|
Backriveted the floor stiffener and shims at the baggage door opening. Then began riveting with the seat back rail and worked forward on the left side. I used a combination of squeezers, including the longeron yoke with the pneumatic squeezer, and gun to reach some difficult rivets. When all the structure was riveted, I clecoed on the left skins in preparation for riveting. Rivet count: 136 Total: 11369 - Plus 549 done at Van's |
||