| Date: |
6-2-2010 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Fuselage bulkhead riveting |
|
|
Deburred and assembled rear bulkhead, then riveted the parts together and added the snap bushings. Fabricated the UHMW wear strip (1/4" short, with rivet spacing adjusted to be correct for called out length so I can correct it later if necessary) and riveted it in position. Rivet count: 26 Total: 4460 |
||