Date:    5-18-2010
Number of Hours:    1.50
Brief Description:    Forward spar fabrication
Fabricated end stiffeners for the spar and drilled/clecoed into place. Assembled mid-spar seat supports and match drilled. Similarly, drilled and clecoed both end pieces to the spar. Drilled the #12 holes in all the parts and then bolted the gear weldments to the spar in preparation for drilling the lower holes next time.