| Date: |
6-30-2015 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Routed A/C hoses |
|
|
I finished the A/C hoses to the firewall and also between the condenser and evaporator. I tightened the fittings after installing them and clamping them onto the hose, and made adel clamps where necessary. I also began installing click-bond studs into the overhead. |
||