| Date: |
7-10-2013 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Primed & Riveted MOD Rib (SB 13-04-05) |
|
|
Primed MOD rib the night before, then installed and riveted to oil tank brackets (last two substeps in step 7). Steps 8 through 10 - NA SB 13-04-05 IS COMPLETE |
||