| Date: |
6-29-2013 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Drilled Holes for Oil Tank Mod Rib (SB 13-04-05) |
|
|
Steps 1 through 5 - NA Laid out holes on F-1201E-L & -R oil tank brackets and drilled holes. Deurrd edges of F-1201G-MOD rib and laid out centerline. Installed rib, aligned centerline in holes in oil tank brackets, and drilled holes (steps 6 and partial 7). |
||