| Date: |
1-11-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Started Center Section Mod (SB 12-11-09) |
|
|
Steps 1 through 7 Since the aircraft is still being built, these steps were not applicable because the following items are not installed: cowling, seat cushions, wings, inspection covers, battery, F-1205G ELT bracket, and fuel tank. Step 8 With Michael's help, used new maintenance stands and raised aircraft off of the ground. Positioned stands at locations specified on page 1-18 of the Maintenance Manual. Step 9 Not applicable since brake fluid not installed yet. Step 10 Disconnected the F-1289D caliper brake lines from outboard sides of U-1203 inboard main gear attach brackets. This step calls out U-1302 which appears to be an error and should be U-1203. Step 11 Removed two outboard cushion clamps securing F-1204Y wire run conduit. Step 12 Marked and drilled 3/8" holes in F-1276 bottom skin on both sides of the fuselage. |
||