Date:    5-24-2012
Number of Hours:    2.20
Brief Description:    Finished RH Wing Connector Update
Received ES-00081 hex standoffs and MS35206-215 screws from Van's. Installed standoffs with Loctite 243. (page 31A-03, step 3)
Page 31A-03 is complete.

Receiver confirmation from Van's that the location for the landing light pulse wire in pin 3 for the RH fuselage connector was incorrect. Pulse wire should have been inserted into pin 5. Moved yellow wire in RH fuselage connector from pin 3 to pin 5. Inserted wires into called out locations in RH wing connector. (page 31A-04, step 10).
Page 31A-04 is complete.

Connected RH wing connector ground wire to rib and connector to standoffs. (page 31A-05, steps 1 and 2 - RH wing).
Page 31A-05 is complete.

Page 31A-07 and 31A-08 is NA.

SECTION 31A WING ELECTRICAL INTERCONNECTOR UPDATE IS COMPLETE