| Date: |
1-16-2012 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Miscellaneous Flight Control Stuff |
|
|
Installed brake reservoir and secured with called out hardware. Torqued bolts to 25 inch-pounds and marked with torque stripe (page 32-02, step 1). Trimmed corners of flap handle blocks. Cut AT6-058X5/16 tube to two 7 3/4-inch lengths for control stick pushrods and drilled out ends with #3 drill. Still need to tap threads. (page 32-04, step 1 and part of step 4). Cut AT6-058X3/4 tube to two 34 5/8-inch lengths for flaperon pushrods. Deburred. (page 32-06, part of step 1). |
||