| Date: |
8-25-2011 |
|
| Number of Hours: |
1.80 |
|
| Brief Description: |
Bulkhead, Nutplates & Bearing Bracket Assembled |
|
|
Riveted the F-1206A bulkhead to the baggage ribs and the nutplates to the aft perimeter of the baggage floors (page 21-03, steps 5 and 6). Installed F-1206F bearing bracket brace and both bearing brace brackets (page 21-03, steps 7 and 8). Page 21-03 is complete. |
||