Date:    8-25-2011
Number of Hours:    1.80
Brief Description:    Bulkhead, Nutplates & Bearing Bracket Assembled
Riveted the F-1206A bulkhead to the baggage ribs and the nutplates to the aft perimeter of the baggage floors (page 21-03, steps 5 and 6).

Installed F-1206F bearing bracket brace and both bearing brace brackets (page 21-03, steps 7 and 8).

Page 21-03 is complete.