Date:    6-4-2011
Number of Hours:    1.50
Brief Description:    Finished Nav/Strobe Lights
Finished LH and RH light extensions by applying fuel sealant to lower flange and riveting extensions to wing. Connected Molex connectors, installed nav/strobe lights, and secured with set screw (page 40-09, steps 1 through 7 and 14).
Page 40-09 is complete

Although not part of the plans, secured Molex connectors together by installing tie wrap prior to pushing connector into wing tip extensions.

Removed blue vinyl from wing skins.