| Date: |
11-26-2010 |
|
| Number of Hours: |
1.20 |
|
| Brief Description: |
Prepped Parts for Pitch Trim/Servo Assy |
|
|
Given all of the angst on other sites about assembling and then disassembling vertical stablizer, rudder, stabilator, and anti-servo tabs, I'm still undecided if I'm going to do these now or wait until they get installed permenantly in a later kit. For now, pressing on with pitch trim/servo assembly. Prepared pitch trim/servo assembly parts by separating and deburring. Also fabricated F-1287G and F-1287H spacers (page 11-05, steps 1 through 4). Page 11-05 is complete. Realized that I don't have a #27 drill bit required on page 11-06, step 5 so I need to buy one before going further with the trim/servo assembly. |
||