Date:    11-5-2010
Number of Hours:    2.80
Brief Description:    Completed Aft Bulkhead (F-1211 Assy)
Installed and riveted fuselage bulkhead, bulkhead doubler, trim brackets, tail skid bracket, hinge brackets, and flange bearings (page 10-04, steps 1 through 14). Everything went together well with no surprises or difficultly encountered.
Page 10-04 is complete.