| Date: |
10-20-2010 |
|
| Number of Hours: |
4.90 |
|
| Brief Description: |
Spar Prep and Parts Primed Ready For Assy |
|
|
Final drilled doublers and drilled control horn hole nutplates (page 09-04, steps 1 through 4). Riveted nutplates to hinge brackets (page 09-04, step 7). Cut hinge stops and separated rib clips (page 09-05, steps 1 and 2). Radiused forward inboard ribs and forward outboard ribs (page 09-06, step 2). Cleaned all parts with acetone, lightly buffed with Scotbrite pads, and primed. |
||