Date:    5-26-2016
Number of Hours:    0.60
Brief Description:    Drill ADSB Cable Panel Base Hole
Page 53-02, step 1 is NA (stuff not yet installed).

Step 2 has already been done as part of the mouse damage tear down.

Drilled 3/4" hole in panel base, deburred, and installed snap bushing.

PAGE 53-02 IS COMPLETE

Page 53-03 steps 3 and 4 are NA (does not apply for GTR-200 installation).

Separated and deburred antenna doublers, discarded one, and deburred (step 5).

PAGE 53-03 IS COMPLETE

On page 53-07, routed ADS-B antenna cable through snap bushing in panel base, aligned red band with snap bushing, and tie-wrapped to transponder cable (step 2).