Date:    3-8-2011
Number of Hours:    2.00
Brief Description:    Tips
I finally started installing the tip on the empennage. That includes the horizontal and vertical stabilizers and the elevator ends. When I get through with those I should have the skills to attack the wing tips. I’ll add more pictures as I go.