| Date: |
3-8-2011 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Tips |
|
|
I finally started installing the tip on the empennage. That includes the horizontal and vertical stabilizers and the elevator ends. When I get through with those I should have the skills to attack the wing tips. I’ll add more pictures as I go. |
||