| Date: |
11-10-2019 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
wiring... |
|
|
Moved the IBBS power leads to the main CB panel. installed most of the last section of the CB panel, started wiring the switches for lights and the flap,ap servo isolator swiches. Ran teh final wires from the rear to the front, wired the GT-50. |
||