Date:    10-16-2019
Number of Hours:    7.00
Brief Description:    more wiring..
Finished wiring the GTX33 ES at the back, and connected it to the GMU 25. more connections to the GMA35 and GTN 750

Wired the DME connector, then ran out of wire... some more due tomorrow

Connected the front Tosten grip and ran the loom through to the panel