Date:    10-13-2019
Number of Hours:    5.00
Brief Description:    panel syub frame, front stick Torsten wiring
Made a new sub-frame for the panel, having butchered the original one during the panel fitting/re-fitting phase. Looks much neater now. Epoxied the new to the old, and will rivet the two together to build a really strong 'hoop' for the top of the panel.

Made the loom from the front stick grip and switches, and painted the stick after shortening it by another 1/4"