| Date: |
5-15-2019 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
engine remounting |
|
|
Finished the fibreglass cover for the main alternator CB cooler box and installed it. Finished off the firewall cover on top of the ceramic fibre heat mat went on. Re-installed the engine on the mount and connected some of the oil and fuel lines again. |
||