Date:    5-15-2019
Number of Hours:    6.00
Brief Description:    engine remounting
Finished the fibreglass cover for the main alternator CB cooler box and installed it. Finished off the firewall cover on top of the ceramic fibre heat mat went on.
Re-installed the engine on the mount and connected some of the oil and fuel lines again.