| Date: |
5-25-2019 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Cowling work |
|
|
Installed all of the sky bolts, and both hinges on the side seams... they look pretty neat!. Some tweaking will be required to get a consistent gap, as it varies between 1/16 and 1/8". Fitted the red box fule flow sensor after the fuel line arrived from TS Flightlines. very pleased with the result. Fitted the throttle for the last time (hopefully!) |
||