| Date: |
3-8-2019 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Roll bar prep |
|
|
Filled and sanded the joints to tidy them up a bit. Sanded the powdercoat, ready for priming. Sprayed first coat of primer. Built the engine hoist |
||